Electrical
Inspection Worksheet
SL
|
Item to be
Checked
|
Comply
|
Not Comply
|
N/A
|
1
|
Electrical Plan Approved
|
□
|
□
|
□
|
Comment:
|
2
|
Circuit Breakers installed per plan
|
□
|
□
|
□
|
Comment:
|
3
|
Wire per specification
|
□
|
□
|
□
|
Comment:
|
4
|
Electrical Panels are well Marked and
Covered
|
□
|
□
|
□
|
Comment:
|
5
|
Electrical Outlets installed per Code
|
□
|
□
|
□
|
Comment:
|
6
|
Access to Main Switch Board unobstructed
|
□
|
□
|
□
|
Comment:
|
7
|
No damaged Socket plugs and /or switches
|
□
|
□
|
□
|
Comment:
|
8
|
No damaged and/ or exposed wires
|
□
|
□
|
□
|
Comment:
|
9
|
Emergency lights installed and working in
each floor,
hallway, stairs and all EXIT points
|
□
|
□
|
□
|
Comment:
|
10
|
Documentation for Routine Testing of
Electrical System and Back-Up system if any
|
□
|
□
|
□
|
Comment:
|
11
|
Emergency Power Supply for elevators (if any
elevators are installed)
|
□
|
□
|
□
|
Comment:
|
12
|
Power Generator
|
□
|
□
|
□
|
Comment:
|
13
|
Sub-Station
|
□
|
□
|
□
|
Comment:
|
14
|
Transformers
|
□
|
□
|
□
|
Comment:
|
15
|
Earthing
|
□
|
□
|
□
|
Comment:
|
______________________ __________________
Signature of Inspector Date
________________________
Name
PSI Audit Services
PSI
Service
Audit
Background | Mission & Vision | Compliance & Integrity | Executive Team | Career | Contact Us
|